Selected work

Three projects, three problems.

A short selection. Longer case notes are available on request.

2025 / Logistics

Meridian Fleet

A dispatch console for 240 vehicles. Replaced a spreadsheet-and-phone workflow with a single timeline view, cut driver assignment time by 40%.

12 weeks · Product design, front-end
2024 / Finance

Arc Ledger

Internal reconciliation tooling. Month-end close went from nine days to two, with an audit trail the finance team actually trusts.

16 weeks · Research, design system
2024 / Research

Field Notes

Offline-first capture for field researchers. Sync conflicts were the whole problem; we made them visible instead of hiding them.

9 weeks · Mobile, offline architecture

References

Happy to put you in touch with the teams behind these projects.

Ask for references